* refactor(cli)!: name a failure's per-call control flag at the CLI boundary
Services name the contract field a deadline failure reports in
details.limit.parameter; a contract command's output projection adds
details.limit.cli_flag from the command's own field-to-flag binding.
BREAKING CHANGE: MCP failures no longer carry details.limit.cli_flag, and
native deadline remediation text no longer names the CLI flag. CLI output
still reports cli_flag for the command that ran.
* fix(cli): key nested flattened members by their dotted path; restore the test's exit status
* refactor(reverse): bind command_timeout_ms as the per-call control of an objdump or Rizin deadline (#11442)
* refactor(reverse): bind command_timeout_ms as the per-call control of an objdump or Rizin deadline
The deadline failure now comes from nativeDeadlineRecovery: it names command_timeout_ms and carries limit {control_kind: "parameter"}, so the CLI projection adds --command-timeout-ms and MCP output names the field only. The service no longer writes CLI flag text.
* refactor(wasm): bind max_artifact_paths as the per-call control of an auxiliary path admission refusal (#11444)