Vitest's expect.poll and vi.waitFor stop after one second by default, a
host-speed guess that the project's deadline policy does not see. Under
hosted-CI load, kunaProjectConcurrency failed that way twice on unrelated
PRs. Another 256 waits relied on the default, and 97 passed literals
picked to fit some host.
Waits now take as long as their test may run, less the reporting reserve
that children already keep. Each Vitest project sets expect.poll's
default, and the new waitFor in tests/support/testWait.ts replaces
vi.waitFor. Fixture readiness waits (awaitAcknowledgement and the provider
process waits) default to the same deadline, and their host-speed literal
arguments are removed. One remainingTestDeadline owns the arithmetic for
both children and waits.
Ten waits whose short timeout was the real check now assert it directly
(Kuna version probe, Cutter discovery, doctor and Inspector cancellation,
apktool fixture teardown, JADX disconnect): settlement before the
production deadline that would otherwise also satisfy the wait, or a
deadline pinned beyond every test deadline.
The rea/project-wait-deadline lint rule rejects vi.waitFor and explicit
expect.poll timeouts. The testing guide and the CI tests audit skill now
document the policy.
Co-Authored-By: gensokyo-dev <342580529+gensokyo-dev@users.noreply.github.com>
Use the shared source owner for Mach-O and PyInstaller admission, descriptor and selected-path identity, hashing and cleanup. Retain lipo joining and reader-owned PyInstaller admission, caller cancellation and private PYZ leases. Centralize admission failure projection and remove the superseded PyInstaller wrapper.
Preserve physical identity verification before late hash-completion cancellation. Close an owned source before returning failed initial metadata acquisition and retain the exact handle when close fails. A focused regression failed twice before that fix and now passes.
Validation: fresh runtime build, 259 focused fixture tests, nine documentation checks and all local static/discovery/duplication gates passed. An earlier check also ran four system-lipo suite cases (three read-only native inspections) before the final source fix; those were excluded from subsequent fixture qualification.