Explicit deadlines at or below the project deadline only shortened it:
a literal 30-second value also disabled the coverage scaling, which timed
out wide-capacity regressions on main. Workloads above the built
deadline use the long-running tag. Deadlines derived from an operation
budget remain.
Co-Authored-By: gensokyo-dev <342580529+gensokyo-dev@users.noreply.github.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
* fix(hopper): report unavailable procedure body coverage
* refactor!: simplify runtime tools and remove replay engines
Keep direct inspection, capture, and comparison tools. Bind handlers to named contracts and let agents compose experiments with commands and local fixture servers.
BREAKING CHANGE: Remove controlled replay, Node characterization, finite replay-machine, managed runtime planning, and redundant string-tracing tools. Retire process replay, shims, reactive scenarios, custom checkpoints, and active browser replay and origin-scope inputs.