Explicit deadlines at or below the project deadline only shortened it:
a literal 30-second value also disabled the coverage scaling, which timed
out wide-capacity regressions on main. Workloads above the built
deadline use the long-running tag. Deadlines derived from an operation
budget remain.
Co-Authored-By: gensokyo-dev <342580529+gensokyo-dev@users.noreply.github.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Join identity-verified PTY family cleanup and native exit before workspace removal, retaining failed cleanup capabilities for retry. Replace duplicate kill-and-reject loops with shared process ownership and deadlines.
Capture configuration before setup using owned file handles and compare raw bytes. Preserve interactive cancellation, terminal restoration, redirected output, and selected inputs; remove the test-only forwarding export. Verified 122 focused cases, 9 README cases, build, static checks, docs, discovery, and duplication at 3.58%.