Commit Graph
5 Commits
Author SHA1 Message Date
ee1450b5d4 test: bound every test process registry by the running test
Registries created directly with createTestProcessRegistry did not get the
processTest default, so a hung child there had no deadline once its explicit
value was removed; Vitest's test timeout does not settle the awaited run, so
shutdown was never reached. Derive the default in the registry from the
running test instead, using the real clock.

Co-Authored-By: gensokyo-dev <342580529+gensokyo-dev@users.noreply.github.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-14 13:21:13 +08:00
077bebe49b test: bound fixture child processes by the remaining test deadline
A processTest child run without its own timeoutMs now gets the test's
remaining deadline less a reporting reserve (at least 5 seconds, or a
tenth of the deadline). A hung child still fails with its captured output,
without a fixed per-call value that assumes a host's speed.

Co-Authored-By: gensokyo-dev <342580529+gensokyo-dev@users.noreply.github.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-14 13:21:13 +08:00
46728ca41d test: remove per-test deadlines owned by project policy
Explicit deadlines at or below the project deadline only shortened it:
a literal 30-second value also disabled the coverage scaling, which timed
out wide-capacity regressions on main. Workloads above the built
deadline use the long-running tag. Deadlines derived from an operation
budget remain.

Co-Authored-By: gensokyo-dev <342580529+gensokyo-dev@users.noreply.github.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-14 05:27:07 +08:00
morluto 38dc9d246b test: own and bound Electron hook fixture processes 2026-11-10 16:32:53 -05:00
morluto 60149282fc test: strengthen integration oracles and verification (#8295)
* test: strengthen integration oracles and verification

* test: bound lifecycle gates and strengthen workflow checks

* test: verify complete paged and extracted results

* test: preserve bytecode and cancellation evidence

* test: strengthen retained evidence and fixture cleanup

* test: require cross-projection bridge identities

* test: retain fixture owners through cleanup failures

* test: verify graph examples and project selectors

* test: tighten provider and lifecycle regressions

* test: consolidate hex coverage and bound cutter cleanup

* test: bound subprocess output waits and strengthen graph checks

* test: check mcp recovery and preserve cleanup owners

* test: verify structured mcp argument failures

* test: preserve artifact cleanup and gdb limit evidence

* test: preserve evidence identities and bound provider gates

* test: retain browser and comparison cleanup owners

* test: bound startup and strengthen fixture oracles

* test: bound lifecycle gates and verify recovered evidence

* test: verify public outcomes and lifecycle ownership

* test: assert precise evidence and release lifecycle gates

* test: verify selected facts and bound cleanup waits

* test: check retained evidence and decoded records

* test: verify final reports and retain cleanup ownership

* test: bound reviewed startup gates and retain cleanup

* test: verify PE errors and preserve MCP cleanup

* test: preserve MCP fixture cleanup ownership

* test: release provider gates before late startup
2026-11-01 00:15:28 +08:00